Amendments

Amendment history

Approved amendments are listed in the table below for historical tracking.

Update No. Brief description Effective date
30 Updated LDM to allow access to PDF hyperlinks 13/08/2018
29 Updated General Water & Sewer Notes to incorporate A-SPEC requirements. 1/07/17
28 Updated standard drawing W-354-C - Sluice Valve Installation 13/09/17
27 Updated Form 1, Form 2 and Form 5 to reflect new pricing for 2016-17 4/07/16
26 Altered LDM website for compatibility with the PDF version of the LDM launched on the 23rd October 2015 23/10/15
25 Updated Forms 1 & Added Form 2 14/07/15
24 Updated Forms 5, 50, 60, 65, 70 7 75 21/08/14
23 Updated Form 1 1/07/14
22 Updated CCTV Specification 19/06/14
21 Updated standard drawings W-363-C 11/06/14
20 Amended Menu layout - moved Infill menu item to top level. Edited Greenfield, Major Infrastructure contents. 21/05/14
19 Updated Policy Pages - Reimbursements 1/7/2013
18 Updated Policy Pages - ESC Pricing Principles 1/7/2013
17 Updated Form 1 with to include tick box for notifying payment of processing fee 2/7/2013
16 Updated Form 40d with editable version & now includes tick box for submission of CCTV of repaired identified defects on forms page 31/10/2012
15 Updated Sewer General Notes (ACAD 2000 format) on standard drawing page - Removed line number on "COMMENCEMENT OF WORKS" sub-heading which altered remaining line numbers 10/10/2012
14

Updated Form 45a,b & c with editable versions on forms page.

Updated Sewer & Water General Notes (ACAD 2000 format) on standard drawing page.

13/09/2012
13 Updated Construction Guidelines Page. 25/06/2012
12 Updated WSAA Bedding materials specifications on Design Page. 15/06/2012
11 Updated all PDF FORMS on Forms page and Greenfield page, except those specified in Update number 9 & 10. Added new form 45c for Tee Cutins and Tappings Under Pressure on water mains. Altered Form 45b to be used for Linkups of water mains only. Added WSAA Bedding materials specifications to Design Page. Updated links to PDFs on Construction page. 14/06/2012
10 Updated PDF FORM 5 Offer of Conditions Acceptance Developer. 16/05/2012
9 Updated CCTV Specification and link to it on Greenfield page. Updated PDF Form 40d CCTV Inspection Testing Of Sewers. Updated General heading, paragraph 7 on the Construction page. 17/04/2012
8 Updated standard drawing W-354-C - Sluice Valve Installation 23/03/2012
7 Updated text formatting on Greenfield page 19/12/2011
6 Updated Wannon Water Supplement to WSAA Sewerage Code 14/11/2011
5 Altered Form 45b and altered water meter servicing diagram. 11/10/2011
4 Added AutoCAD 2000 format Water & Sewer General Notes to Standard Drawings page 21/09/2011
3 Updated Wannon Water Supplement to WSAA and Water Code Requirements 19/09/2011
2 Updated Wannon Water Supplement to WSAA - Water Reticulation Codes Page 8 15/09/2011
1 Updated Forms 45a & 45b 14/09/2011
0 Initial implementation 01/09/2011